On 28 February 2014 in Ajmer, Prime Minister Narendra Modi introduced the National HPV vaccination campaign against cervical cancer and engaged with five girls aged between 9-14 years after vaccination. It is also during this time that he announced a huge development package of Rajasthan, providing 43 projects worth 16,686 crore in the form of inaugurations and foundation-laying. It consists of the package of 34 state-government projects (approximately 8,554 crore) and 9 central-government projects (approximately 8,132 crore) directly connected with the national highways and energy. The programme was also marked with the distribution of the appointment letters of 21,863 to the chosen youths in various state departments.

The campaign focuses on cervical cancer because HPV predominantly attacks its target organ, i.e., the cervix.

  • Introduced at a vaccination center at Kayad Vishramsthali, Ajman.
  • PM had contact with five of the vaccinated girls (9-14 years).
  • Cervical cancer was a disease that was pronounced as a severe illness contributed by women.
  • In over 99 percent of the cases worldwide, it was mentioned as the primary cause, which was the HPV infection.
  • Vaccination was required to be registered on the U-WIN platform.

43 projects under 16,686 Crore Development Package.

Split of projects:

  • State Government: 34 projects, approximated to be 8,554 crore (within various departments).
  • Central Government: 9 initiatives/projects and approximately, ₹8,132 crore (attached to National Highways and Energy).
  • Some of the major areas are:  Public Health Engineering, Energies, Water Resources, Industry, Public Works, Urban Development and Housing and National Highways.

Big National Highways (₹4,516+ Crore)

  • National highway projects of above 4516 crore were commissioned and/or opened.

 Key components include:

  • Bandikui-Jaipur 4 lane Greenfield Expressway: approximately 1208 crore.
  • Delhi- Vadodara Access-Controlled Greenfield Expressway (Package 14): opening of an 8 lane carriageway between the NH 76 junction to NH12 on the Ummedpura village at a cost of approximately 1,114 crores.

Expansion/Upgradation Widening/ Strengthening Works.

  • NH 248: Shahpura- Thanagazi 2-lane road - ₹103 crore.
  • Phase-I: Devgarh to Rajasthan-Gujarat border: road construction 
  • NH 89 (now NH 58) Ajmer to Nagaur section: upgrade to 2-lane paved shoulder - ₹190 crore.
  • Jaisalmer Sam Dhanana Road: widening and strengthening - ₹110 crores.

 Urban Road and Highway Works

  • Jaipur: Elevated road past Sanganer Flyover to Malpura Gate by Chauradiya Petrol Pump - -286+ crore.
  • Jodhpur: 4-lane elevated road 4-lane elevated road between Mahamandir and Akhaliya Circle - 1243 crore.
  • Baran district: Malbamori-Mangrol-Baran State Highway- estimates ₹322 crore.
  • Sawai Madhopur: NH 552 KustlaSawai Madhopur stretch 4-lane work - 4-lane work 4-lane work - 4-lane work 

Drinking Water and Canal Works Industry, Drinking Water and Canal Works.

  • Jodhpur -Pali -Marwar industrial area (JPMIA): infrastructure and drinking water related works - /526 crore.

 Bulk drinking water projects:

  • Nonera bulk drinking water project: 4 packages, cost over 1021 crore.
  • ParvanAkawad bulk drinking water project: 5 packages, 2247 crore.
  • Bikaner district bulk drinking water project: 2 works, 660 crores.
  • Canal development and renovation was initiated in Bikaner, Phalodi, Jaisalmer, Hanumangarh and Dungarpur.

This represents one of the renewable energy transmission and grid infrastructures.

  • Commissioning of a 3,616 crore transmission system to facilitate easy transmission of power across major renewable power generation centres.

 Foundation-laying of power associated works to the value of 1,781 crore including:

  • Five 220 kV grid sub-stations (GSS)
  • Two 400 kV grid sub-stations (GSS)

Distributed Letters of Appointment 21,863.

  • 21,863 appointment letters were issued in the state departments.

 Major categories include:

  • Patwari (Revenue): 3,320

The rural development job titles include Contract Junior Technical Assistant and Contract Accounts Assistant, both with 2,291.

  • Livestock Assistant: 2,590
  • Animal Attendant: 281
  • Community Health Officer: 3,822
  • Pharma Assistant: 472
  • Ayurved Compounder: 203
  • Medical and Health Department (different positions): 335.
  • Public Health Cadre nurses and allied nursing/labs posts (including Nurse Grade-II): 7,357.
  • Mining Department (various posts): 101
  • Other departments also featured in the appointments such as the School Education.
  • The Prime Minister received the appointment letters in symbolic manner and gave them to two young people.

Objectives and Benefits

 Objectives

  • Enhance preventive public health with the use of the National HPV vaccination campaign.
  • enhance accessibility and road network with national highway and urban road projects.
  • Increase access to safe drinking water through bulk water projects and other related works.
  • Promote integration of renewable energy using transmission and sub-stations of the grid.
  • Increase the capacity of the delivery of the public services by recruiting many people.

Benefits

  • Quicker access to prevention against the risk of cervical cancer through vaccination in the target population.
  • Improved transportation of people and supplies by improved highways and urban transport.
  • Multi-package bulk drinking water projects to enhance water security.
  • Improved evacuation of power generated in renewable energy centers by the presence of enhanced power transmission systems.
  • More jobs and enhanced workforce in revenue and rural development, health, and others.

 Conclusion 

The Ajmer programme was a massive action that involved a giant intervention in a large-scale public-health effort. The Overview of the National HPV vaccination program aims at preventing cervical cancer on a long-term basis and 16,686 crore of the projects focus on roads, water, energy, and industrial infrastructure. The issuance of 21, 863 appointment letters strengthens the aspect of human-resource capacity in terms of governance and service delivery in Rajasthan.

 

MCQs (English)

1. What was the origin state of the National HPV vaccination campaign against cervical cancer?

(a) Headquarters Jaipur Police.

(b) Kayad Vishramsthali, Ajmer

(c) Jodhpur Medical College Campus.

(d) Bikaner District Hospital

Answer: (b)

Explanation : The campaign was initiated at one of the vaccination centers in Ajmer, called Kayad Vishramsthali. The programme targeted the vaccination of girls aged 9-14 years and insisted on rapid execution via obligatory registration system within the U-WIN site.

2. How many projects were under the development package of the National Highways and Energy departments of the Central Government that had a price tag of less than 16 686 crore?

(a) 34

(b) 43

(c) 9

(d) 16

Answer: (c)

Explanation: There were 43 projects covered in the total package. Among them, 34 of these projects belonged to the state government departments, and 9 large projects were related to the central government, namely, the works related to national highways and the energy.

3. What is the most accurate statement to correspond to the renewable-energy evacuation initiative announced at the event?

(a) 1208 crore transmission system and 5 400 kV GSS.

(b) 3,616 crore transmission system and five 220 kV and two 400 kV GSS less than 1,781 crore works.

c) 220 kV Two 220 kV GSS and transmission system 2,247 crore.

(d) 286 crore transmission system and seven 220 kV GSS.

Answer: (b)

Rationalisation: A transmission system of 3,616 crore was commissioned to facilitate the easy flow of power in renewable energy centres. Moreover, the 1,781 crore of power development works were also initiated consisting of five 220 kV and two 400 kV grid sub-stations.

 

एचपीवी के विरुद्ध राष्ट्रीय टीकाकरण अभियान, बहु-क्षेत्रीय विकास परियोजनाएं, राष्ट्रीय राजमार्ग, पेयजल, नवीकरणीय ऊर्जा पारेषण, नागरिक भर्ती

28 फरवरी को अजमेर में प्रधानमंत्री नरेंद्र मोदी ने सर्वाइकल कैंसर के विरुद्ध राष्ट्रीय एचपीवी टीकाकरण अभियान का शुभारंभ किया और टीकाकरण के बाद 9–14 वर्ष आयु वर्ग की पांच बालिकाओं से संवाद किया। इसी अवसर पर उन्होंने राजस्थान के लिए ₹16,686 करोड़ के 43 परियोजनाओं वाले बड़े विकास पैकेज की घोषणा भी की, जिनमें शिलान्यास और लोकार्पण शामिल हैं। इस पैकेज में 34 राज्य सरकार की परियोजनाएं (लगभग ₹8,554 करोड़) तथा 9 केंद्र सरकार की परियोजनाएं (लगभग ₹8,132 करोड़) शामिल हैं, जो मुख्यतः राष्ट्रीय राजमार्ग और ऊर्जा से जुड़ी हैं। कार्यक्रम में विभिन्न विभागों में चयनित 21,863 युवाओं को नियुक्ति पत्र भी वितरित किए गए।

सर्वाइकल कैंसर के विरुद्ध राष्ट्रीय एचपीवी टीकाकरण अभियान

  • अभियान का शुभारंभ कायड़ विश्रामस्थली, अजमेर स्थित टीकाकरण केंद्र से किया गया।
  • प्रधानमंत्री ने 9–14 वर्ष की पांच टीकाकृत बालिकाओं से संवाद किया।
  • सर्वाइकल कैंसर को महिलाओं को प्रभावित करने वाला गंभीर रोग बताया गया।
  • वैश्विक स्तर पर इसके 99% से अधिक मामलों का प्रमुख कारण एचपीवी संक्रमण बताया गया।
  • टीकाकरण के लिए यू-विन मंच पर अनिवार्य पंजीकरण की व्यवस्था सुनिश्चित की गई।

₹16,686 करोड़ का विकास पैकेज: 43 परियोजनाएं

  • कुल 43 परियोजनाएं, कुल लागत ₹16,686 करोड़
  • परियोजनाओं का विभाजन:
    • राज्य सरकार: 34 परियोजनाएं, लगभग ₹8,554 करोड़ (विभिन्न विभागों में)।
    • केंद्र सरकार: 9 परियोजनाएं, लगभग ₹8,132 करोड़ (राष्ट्रीय राजमार्ग और ऊर्जा से संबद्ध)।
  • प्रमुख क्षेत्र: जन स्वास्थ्य एवं अभियांत्रिकी, ऊर्जा, जल संसाधन, उद्योग, सार्वजनिक निर्माण, नगरीय विकास एवं आवासन, राष्ट्रीय राजमार्ग

प्रमुख राष्ट्रीय राजमार्ग परियोजनाएं (₹4,516+ करोड़)

  • ₹4,516 करोड़ से अधिक के राष्ट्रीय राजमार्ग कार्यों का शिलान्यास/लोकार्पण किया गया।
  • प्रमुख घटक:
    • बांदीकुई–जयपुर 4-लेन ग्रीनफील्ड एक्सप्रेसवे: लगभग ₹1,208 करोड़
    • दिल्ली–वडोदरा एक्सेस कंट्रोल्ड ग्रीनफील्ड एक्सप्रेसवे (पैकेज 14): एनएच 76 जंक्शन से एनएच 12 पर उम्मेदपुरा गांव तक 8-लेन कैरिजवे का लोकार्पण, लगभग ₹1,114 करोड़

विस्तार/उन्नयन/चौड़ीकरण/सुदृढ़ीकरण के कार्य

  • एनएच 248: शाहपुरा–थानागाजी 2-लेन सड़क₹103 करोड़
  • देवगढ़ से राजस्थान–गुजरात सीमा (चरण-एक): सड़क निर्माण — ₹546 करोड़
  • एनएच 89 (नया एनएच 58) अजमेर–नागौर सेक्शन: पक्के शोल्डर सहित 2-लेन उन्नयन₹190 करोड़
  • जैसलमेर सम–धनाना रोड: चौड़ीकरण एवं सुदृढ़ीकरण₹110 करोड़

शहरी सड़क एवं राजमार्ग कार्य

  • जयपुर: सांगानेर फ्लाईओवर से चौरड़िया पेट्रोल पंप होते हुए मालपुरा गेट तक एलिवेटेड रोड₹286+ करोड़
  • जोधपुर: महामंदिर से अखलिया चौराहे तक 4-लेन एलिवेटेड रोड₹1,243 करोड़
  • बारां जिला: मालबमोरी–मांग्रोल–बारां राज्य राजमार्ग — अनुमानित ₹322 करोड़
  • सवाई माधोपुर: एनएच 552 पर कुस्तला–सवाई माधोपुर सेक्शन 4-लेन कार्य₹111 करोड़

उद्योग, पेयजल और नहर कार्य

  • जोधपुर–पाली–मारवाड़ औद्योगिक क्षेत्र (जेपीएमआईए): आधारभूत ढांचा व पेयजल संबंधी कार्य — ₹526 करोड़
  • वृहद पेयजल परियोजनाएं:
    • नोनेरा वृहद पेयजल परियोजना: 4 पैकेज, लागत ₹1,021 करोड़ से अधिक
    • परवन–अकावद वृहद पेयजल परियोजना: 5 पैकेज, ₹2,247 करोड़
    • बीकानेर जिला वृहद पेयजल परियोजना: 2 कार्य, ₹660 करोड़
  • बीकानेर, फलौदी, जैसलमेर, हनुमानगढ़, डूंगरपुर में नहर विकास एवं जीर्णोद्धार कार्यों का शिलान्यास किया गया।

नवीकरणीय ऊर्जा पारेषण एवं ग्रिड अवसंरचना

  • नवीकरणीय ऊर्जा केंद्रों से बिजली के सुगम पारेषण हेतु ₹3,616 करोड़ की पारेषण प्रणाली का लोकार्पण।
  • ₹1,781 करोड़ के विद्युत विकास कार्यों का शिलान्यास, जिनमें शामिल:
    • 5 ग्रिड सब-स्टेशन (220 केवी)
    • 2 ग्रिड सब-स्टेशन (400 केवी)

21,863 नियुक्ति पत्रों का वितरण

  • विभिन्न राज्य विभागों में चयनित 21,863 युवाओं को नियुक्ति पत्र दिए गए।
  • प्रमुख श्रेणियां:
    • पटवारी (राजस्व): 3,320
    • संविदा कनिष्ठ तकनीकी सहायक व संविदा लेखा सहायक (ग्रामीण विकास): 2,291
    • पशुधन सहायक: 2,590
    • पशु परिचर: 281
    • सामुदायिक स्वास्थ्य अधिकारी: 3,822
    • फार्मा असिस्टेंट: 472
    • आयुर्वेद कंपाउंडर: 203
    • चिकित्सा एवं स्वास्थ्य विभाग (विभिन्न पद): 335
    • पब्लिक हेल्थ केडर नर्स व संबद्ध नर्सिंग/लैब पद (नर्स ग्रेड-द्वितीय सहित): 7,357
    • खनन विभाग (विभिन्न पद): 101
    • अन्य विभागों में स्कूल शिक्षा आदि भी शामिल।
  • प्रधानमंत्री ने प्रतीकात्मक रूप से दो युवकों को नियुक्ति पत्र प्रदान किए।

उद्देश्य और लाभ

उद्देश्य

  • राष्ट्रीय एचपीवी टीकाकरण अभियान के माध्यम से निवारक सार्वजनिक स्वास्थ्य को सुदृढ़ करना।
  • राष्ट्रीय राजमार्ग एवं शहरी सड़क परियोजनाओं से संपर्कता और सड़क नेटवर्क को बेहतर बनाना।
  • वृहद पेयजल परियोजनाओं के जरिए सुरक्षित पेयजल पहुंच बढ़ाना।
  • पारेषण व ग्रिड सब-स्टेशनों के माध्यम से नवीकरणीय ऊर्जा एकीकरण को मजबूत करना।
  • बड़े पैमाने पर भर्ती से सार्वजनिक सेवा वितरण क्षमता बढ़ाना।

लाभ

  • लक्षित आयु वर्ग में टीकाकरण के जरिए सर्वाइकल कैंसर जोखिम की दीर्घकालिक रोकथाम की दिशा में प्रगति।
  • उन्नत राजमार्गों व शहरी मार्गों से लोगों और वस्तुओं की आवाजाही बेहतर।
  • बहु-पैकेज पेयजल परियोजनाओं से जल सुरक्षा में सुधार।
  • नवीकरणीय ऊर्जा केंद्रों से विद्युत निकासी/पारेषण अधिक सुगम।
  • राजस्व, ग्रामीण विकास, स्वास्थ्य आदि में रोजगार और कार्यबल क्षमता में वृद्धि।

निष्कर्ष 

अजमेर कार्यक्रम में सार्वजनिक स्वास्थ्य के बड़े हस्तक्षेप और बहु-क्षेत्रीय विकास कार्यों का संयोजन दिखा। राष्ट्रीय एचपीवी टीकाकरण अभियान दीर्घकालिक रूप से सर्वाइकल कैंसर की रोकथाम की दिशा में केंद्रित है, जबकि ₹16,686 करोड़ की परियोजनाएं सड़क, जल, ऊर्जा और औद्योगिक अवसंरचना को मजबूत करती हैं। 21,863 नियुक्ति पत्रों का वितरण शासन और सेवा-प्रदान के लिए मानव संसाधन क्षमता बढ़ाता है।

 

बहुविकल्पीय प्रश्न (हिंदी)

1. सर्वाइकल कैंसर के विरुद्ध राष्ट्रीय एचपीवी टीकाकरण अभियान का शुभारंभ राजस्थान में किस स्थान से किया गया?
(a) जयपुर पुलिस मुख्यालय
(b) कायड़ विश्रामस्थली, अजमेर
(c) जोधपुर मेडिकल कॉलेज परिसर
(d) बीकानेर जिला अस्पताल
उत्तर: (b)
व्याख्या: यह अभियान अजमेर के कायड़ विश्रामस्थली स्थित टीकाकरण स्थल से शुरू किया गया। कार्यक्रम में 9–14 वर्ष की बालिकाओं के टीकाकरण पर जोर दिया गया और टीकाकरण को तेज़ी से लागू करने के लिए यू-विन मंच पर अनिवार्य पंजीकरण की व्यवस्था सुनिश्चित की गई।

2. ₹16,686 करोड़ के विकास पैकेज में केंद्र सरकार के राष्ट्रीय राजमार्ग और ऊर्जा विभाग से जुड़ी परियोजनाओं की संख्या कितनी थी?
(a) 34
(b) 43
(c) 9
(d) 16
उत्तर: (c)
व्याख्या: कुल 43 परियोजनाओं के पैकेज में 34 परियोजनाएं राज्य सरकार के विभिन्न विभागों की थीं, जबकि 9 प्रमुख परियोजनाएं केंद्र सरकार से संबंधित थीं, जो विशेष रूप से राष्ट्रीय राजमार्ग और ऊर्जा से जुड़ी थीं।

3. कार्यक्रम में घोषित नवीकरणीय ऊर्जा पारेषण एवं ग्रिड अवसंरचना पहल का सही संयोजन कौन-सा है?
(a) ₹1,208 करोड़ पारेषण प्रणाली और 5 (400 केवी) ग्रिड सब-स्टेशन
(b) ₹3,616 करोड़ पारेषण प्रणाली और ₹1,781 करोड़ के कार्यों में 5 (220 केवी) तथा 2 (400 केवी) ग्रिड सब-स्टेशन
(c) ₹2,247 करोड़ पारेषण प्रणाली और 2 (220 केवी) ग्रिड सब-स्टेशन
(d) ₹286 करोड़ पारेषण प्रणाली और 7 (220 केवी) ग्रिड सब-स्टेशन
उत्तर: (b)
व्याख्या: नवीकरणीय ऊर्जा केंद्रों से बिजली के सुगम पारेषण हेतु ₹3,616 करोड़ की पारेषण प्रणाली का लोकार्पण किया गया। साथ ही ₹1,781 करोड़ के विद्युत विकास कार्यों का शिलान्यास किया गया, जिसमें 5 (220 केवी) और 2 (400 केवी) ग्रिड सब-स्टेशन शामिल हैं

Offer
Request Callback